TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
Start engine and functionally test appropriate pneumatic systems.
(3)
Check for air leaks.
(4)
(5)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Air system drained.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer