AIR TANK REPLACEMENT. - Continued
BRAKE CONTROL VALVE REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  600    601    602    603    604  605  606    607    608    609    610  
img
. . . . . . . . . . . .
TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
Replace air lines (Para 15-8).
(2)
Start engine and functionally test appropriate pneumatic systems.
(3)
Check for air leaks.
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Install belly plates, as needed (TM 5-2420-230-10).
END OF TASK
15-7. BRAKE CONTROL VALVE REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Para 15-4
Air system drained.
Materials/Parts
Cap and plug set, Item 4, Appendix C
Drawings Required
Tags, identification, Item 63, Appendix C
TM 5-2420-230-24P Figure 125
Ties, cable, Item 68, Appendix C
Estimated Time to Complete Task
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
15-10