15-3. RESTORE IHMEE TO OPERATIONAL READINESS.
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using the following
procedure:
(1)
Place electrical master switch in ON position (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
(3)
Ensure parking brake is applied (TM 5-2420-230-10).
(4)
Start engine (TM 5-2420-230-10).
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position as required
(TM 5-2420-230-10).
(6)
Complete necessary documents and return IHMEE to relevant authority
.
15-4. DRAINING AIR SYSTEM.
This Task Covers:
a. Draining
b. Inspection
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
ground.
Special Tools
Pan, drain, Item 29, Appendix B
TM 5-2420-230-10
Parking brake applied.
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Engine shut OFF.
TM 5-2420-230-10
Electrical master switch OFF.
TM 5-2420-230-10
"Do Not Operate" tag attached
Materials/Supplies
Soap solution, Item 56, Appendix C
to ignition switch.
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
None
References
Estimated Time to Complete Task
FO-5, Pneumatic schematic
0.3 hr.
Change 1
15-2