TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
END OF TASK
This Task Covers:
a. Removal
b. Cleaning
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
Compound, sealing, pipe thread, Item 23, Appendix C
to ignition switch.
Hood raised.
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
References
None
Estimated Time to Complete
Change 1