DRIVE SHAFT AND U-JOINT MAINTENANCE. - Continued
FRONT AXLE ASSEMBLY REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  584    585    586    587    588  589  590    591    592    593    594  
img
. . . . . . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
e. Installation.
Installation of the drive shaft is a reversal of the removal procedure with attention given to the following points:
(1)
Ensure alignment marks are aligned when refitting drive shaft.
(2)
Ensure all securing nuts and bolts are replaced and tightened to specified torque (Appendix E).
(3)
If a new drive shaft is fitted, ensure it is adequately lubricated prior to driving vehicle.
f. Follow-On Maintenance.
(1)
Install center belly plate (TM 5-2420-230-10).
(2)
Lower vehicle (Para 2-21).
(3)
Deleted.
END OF TASK
14-6. FRONT AXLE ASSEMBLY REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
FEL raised and maintenance
arm installed.
Tools and Special Tools
Tool kit, common no. 2, Item 36, Appendix B
Para 15-4
Air system drained.
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Front tires removed.
Para 8-8
Front brakes caged.
Para 14-5
Front drive shaft removed.
Materials/Parts
Cap and plug set, Item 4, Appendix C
Para 14-8
Front differential breather
Tags, identification, Item 63, Appendix C
removed.
Ties, cable, Item 68, Appendix C
Para 6-8
Front shock absorbers
removed.
Para 6-4
Front check straps removed.
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Para 6-5
Front air bags removed.
References
Drawings Required
None
TM 5-2420-230-24P Figure 100
Estimated Time to Complete
Refer to MAC in Appendix B
Change 1
14-9