TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
FEL raised and maintenance
arm installed.
Tools and Special Tools
Air system drained.
Rear tires removed.
Rear brakes caged.
Rear drive shaft removed.
Materials/Parts
Rear differential breather
removed.
Rear shock absorbers removed.
Rear check straps removed.
Rear air bags removed.
Personnel Required
MOS 62B, Construction Equipment Repairer (3)
Sway bar removed.
References
Drawings Required
None
Estimated Time to Complete
Change 1