TM 5-2420-230-24-1
This Task Covers:
a. Align Front Wheels
b. Adjustment
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Test Equipment
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
"Do Not Operate" tag attached
Materials/Parts
to ignition switch.
Tire pressure correct.
Vehicle raised (front axle only).
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer (2)
Estimated Time to Complete Task
References
None
a. Align Front Wheels.
(1)
(2)
Position chalk against center of left wheel and tire assembly (1).
(3)
Rotate left wheel and tire assembly (1) by hand until a 1-in. (25 mm) wide chalk mark (2) is made along center of
tire tread.
Change 1