TM 5-2420-230-24-1
(1)
Remove air lines (1) by pushing in on brass
coupling (2) and pulling air line at the same time.
(2)
Remove fitting (3) from air valve (4).
(3)
Remove bolts (5) and washers (6) from air
valve (4).
b. Installation.
(1)
Position air valve (4) and install washers (6) and
bolts (5).
(2)
Install fittings (3) on air valve (4).
(3)
Install air lines (1) by pushing in on brass
coupling (2) and air lines at the same time.
c. Follow-On Maintenance.
(1)
Start engine and functionally test appropriate
(2)
(3)
(4)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Belly plates removed, as
needed.
Tools and Special Tools
Air system drained.
Air lines removed.
Materials/Parts
Drawings Required
Figure 126
Figure 127
Figure 128
Figure 129
Personnel Required
MOS 62B, Construction Equipment Repairer
Figure 130
Figure 131
References
None
Estimated Time to Complete Task
Change 1