• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT-END LOADER (FEL) ARM MAINTENANCE. - Continued
FRONT-END LOADER (FEL) ARM MAINTENANCE. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  622    623    624    625    626  627  628    629    630    631    632  
img
.
TM 5-2420-230-24-1
b. Disassembly.
FEL arm assembly weighs approximately 1,543 lb. (700 kg). Ensure FEL arms are directly supported
before disassembly. Failure to comply may result in serious injury or death to personnel.
NOTE
Tag all hoses, wires, and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
Remove clamps and cable ties as necessary.
Ensure all hoses, wires, and tubes are disconnected and clear before removal.
Place drain pan beneath hoses and tubes before disconnecting.
(1)
Remove bolt (16), washer (17), and cushion clamp (18) on each FEL arm.
(2)
Remove four nuts (19), washers (20), screws (21) and front light wire harness (22) on each side of quick-hitch
assembly (23).
(3)
Remove both tilt cylinders (Para 10-23).
Quick-hitch assembly is heavy. Use an appropriate lifting device and follow safe working procedures
when lifting or moving quick-hitch assembly. Failure to comply may result in injury or death to
personnel.
(4)
Attach lifting device and sling to quick-hitch assembly (23).
17-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.