TM 5-2420-230-24-1
This Task Covers:
a. Disassembly
b. Assembly
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Materials/Parts (Cont.)
None
Tools and Special Tools
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
References
None
Equipment, suitable lifting
Equipment Conditions
TM or Para
Condition Description
Materials/Parts
Vehicle raised.
Brakes caged.
Wheels and tires removed.
Hub oil drained.
Drawings Required
Estimated Time to Complete Task
a. Disassembly.
(1)
(2)
Refer to page J-96 to disassemble the axle hub and annulus units.
Change 1