• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REAR BRAKE SHOE REPLACEMENT.
REAR DIFFERENTIAL ASSEMBLY REPAIR.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  1082    1083    1084    1085    1086  1087  1088    1089    1090    1091    1092  
img
. . . . . . . . . . . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
c. Follow-On Maintenance.
Install brake drum (Para J-10).
END OF TASK
J-13. REAR AXLE REPAIR (DRIVE HEAD REPLACEMENT).
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer
References
Tools and Special Tools
None
Dunnage, suitable
Equipment, suitable lifting
Equipment Conditions
Field, maintenance, basic, Item 23, Appendix B
TM or Para
Condition Description
Pan, drain, Item 29, Appendix B
Para 2-21
Vehicle raised.
Tool kit, common no. 2, Item 36, Appendix B
Para 8-8
Brakes caged.
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Wheels and tires removed.
Para 14-4
Hub oil drained.
Materials/Parts
Compound, sealing (Loctite 515), Item 21,
Drawings Required
Appendix C
TM 5-2420-230-24P Figure 99
Nut, self-locking, Item 126.2, Appendix D (18)
TM 5-2420-230-24P Figure 103
O-ring, Item 156, Appendix D (6)
Estimated Time to Complete Task
Sealing compound, Loctite 242, Item 19, Appendix C
Refer to MAC in Appendix B
a. Removal.
Refer to page J-112 to remove drive head from axle.
b. Installation.
(1)
Refer to page J-128 to install drive head into axle.
(2)
Refer to page J-130 for final installation of drive head.
c. Follow-On Maintenance.
(1)
Fill hub oil (TM 5-2420-230-10).
(2)
Install wheels and tires (TM 5-2420-230-10).
(3)
Lower vehicle (Para 2-21).
(4)
Uncage the brakes (Para 8-8).
(5)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
Change 1
J-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.