TM 5-2420-230-24-1
c. Follow-On Maintenance.
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer
References
Tools and Special Tools
None
Dunnage, suitable
Equipment, suitable lifting
Equipment Conditions
TM or Para
Condition Description
Vehicle raised.
Brakes caged.
Wheels and tires removed.
Hub oil drained.
Materials/Parts
Compound, sealing (Loctite 515), Item 21,
Drawings Required
Estimated Time to Complete Task
Sealing compound, Loctite 242, Item 19, Appendix C
a. Removal.
Refer to page J-112 to remove drive head from axle.
b. Installation.
(1)
(2)
c. Follow-On Maintenance.
(1)
(2)
(3)
(4)
(5)
END OF TASK
Change 1