• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Cylinder Block - Removing From the Rollover Stand (0-67)
Crankshaft - Installation (0-71)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  126    127    128    129    130  131  132    133    134    135    136  
img
.
TM 5-2420-230-24-2
Valve Tappets - Installation (0-70)
Section 0 - Engine Disassembly and Assembly - Group 00
Page 0-42
B Series Shop Manual
Caution: Be sure the cylinder bores are clean.
Valve Tappets - Installation (0-70)
Lubricate the tappets with Lubriplate 105 .
Install the valve tappets.
Crankshaft - Installation (0-71)
23 mm
Remove the main bearing caps.
L-131


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.