• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93)
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93) - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  165    166    167    168    169  170  171    172    173    174    175  
img
TM 5-2420-230-24-2
Section 0 - Engine Disassembly and Assembly - Group 00
Injection Pump - Installation (0-88)
B Series Shop Manual
Page 0-81
22 mm; 8 mm Allen or 10 mm Hex
Turn the shaft so the key is aligned with the hash mark on
the seal housing.
Lock the pump shaft by tightening the lockscrew.
Torque Value: 30 Nm
[22 ft-lb]
Remove the drive nut and washer from the drive shaft by
striking the wrench with a sharp blow in a counterclock-
wise direction.
Be sure the timing pin is disengaged.
Caution: Make sure the key does not fall into the gear
housing.
Install the pump.
L-170


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.