• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Unlocked Stanadyne DB4 Injection Pump - Installation (0-92) - Continued
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  163    164    165    166    167  168  169    170    171    172    173  
img
TM 5-2420-230-24-2
Section 0 - Engine Disassembly and Assembly - Group 00
Injection Pump - Installation (0-88)
B Series Shop Manual
Page 0-79
22 mm
Secure the drive gear with the mounting nut and washer.
NOTE: This is not the final torque value.
Torque Value: 15 Nm
[11 ft-lb]
Disengage the timing pin.
22 mm
Tighten the drive gear mounting nut.
Torque Value: 65 Nm
[48 ft-lb]
13 mm
Rotate the pump to align the scribe marks on the pump
and housing.
Tighten the mounting nuts.
Torque Value: 30 Nm
[22 ft-lb]
L-168


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.