• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Injection Pumps - Unlocking (0-90)
Unlocked CAV Injection Pump - Installation

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  159    160    161    162    163  164  165    166    167    168    169  
img
TM 5-2420-230-24-2
Section 0 - Engine Disassembly and Assembly - Group 00
Injection Pump - Installation (0-88)
B Series Shop Manual
Page 0-75
The Bosch P7100 has a timing pin located under a cap on
the outboard side of the governor. To unlock the pump the
position of the pin is reversed under the cap.
Disengage the timing pin.
22 mm or 27 mm
Tighten the drive gear mounting nut.
Torque Value
Stanadyne, Bosch and CAV (Rotary)  65 Nm [ 48 ft-lb]
Nippondenso EP9
123 Nm [91 ft-lb]
Bosch P7100
165 Nm [122 ft-lb]
Chisel, Hammer
If a rebuilt pump is being installed, permanently mark the
injection pump flange to match the mark on the gear
housing. The Nippondenso EP9 and Bosch P7100 do not
require timing marks.
L-164


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.