• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Unlocked Stanadyne DB4 Injection Pump - Installation (0-92)
Unlocked Stanadyne DB4 Injection Pump - Installation (0-92) - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  162    163    164    165    166  167  168    169    170    171    172  
img
TM 5-2420-230-24-2
Injection Pump - Installation (0-88)
Section 0 - Engine Disassembly and Assembly - Group 00
Page 0-78
B Series Shop Manual
Verify the timing marks are aligned after lock timed.
Install the fuel injection pump timing cover.
Secure the pump by finger tightening the mounting nuts.
3/8 Inch
Loosen the Stanadyne DB4 fuel injection pump lock screw
and position the special washer behind the lock screw
head.
Tighten the lock screw.
L-167


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.