• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93) - Continued
P7100 Injection Pump Installation

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  167    168    169    170    171  172  173    174    175    176    177  
img
TM 5-2420-230-24-2
Section 0 - Engine Disassembly and Assembly - Group 00
Injection Pump - Installation (0-88)
B Series Shop Manual
Page 0-83
13 mm
Rotate the pump to align the scribe marks on the pump
and housing.
Tighten the three mounting nuts.
Torque Value: 24 Nm
[18 ft-lb]
Disengage the TDC pin.
Be sure the backlash is correct for replaced gears.
Use a dial indicator to measure backlash.
Pump Gear Backlash Limit
A = .076 to .330 mm [0.003 to 0.013 in]
L-172


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.