• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93) - Continued
Unlocked Bosch VE and P7100 Injection Pump - Installation (0-93) - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
TM 5-2420-230-24-2
Injection Pump - Installation (0-88)
Section 0 - Engine Disassembly and Assembly - Group 00
Page 0-84
B Series Shop Manual
10 mm
Attach the injection pump support bracket. Finger tighten
all capscrews before final tightening.
NOTE: Tighten the capscrews which attach the bracket to
the block (1) before tightening the capscrew which secures
the bracket to the pump (2).
Torque Value: 24 Nm
[18 ft-lb]
P7100 Injection Pump Installation
Make sure the engine has Cylinder No. 1 at TDC.
The injection pump also has a timing pin (1), located in
the governor housing, to position the pump shaft to cor-
respond with TDC for Cylinder No. 1. The pin is to be
reversed and stored in the housing (2) after the pump is
installed.
24 mm
Remove the access plug.
L-173


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.