• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Cylinder Head - Tightening (0-102) - Continued
Valve Clearance - Adjustment (0-103) - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  181    182    183    184    185  186  187    188    189    190    191  
img
.
TM 5-2420-230-24-2
Section 0 - Engine Disassembly and Assembly - Group 00
Valve Clearance - Adjustment (0-103)
B Series Shop Manual
Page 0-97
13 mm
Tighten the 8mm pedestal capscrews.
Torque Value: 24 Nm
[18 ft-lb]
Valve Clearance - Adjustment (0-103)
Turn the valve adjustment screws in until they touch the
push rod sockets. Loosen them one full turn.
Locate TDC for Cylinder Number 1.
Disengage the timing pin.
L-186


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.