• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Crankshaft Gear - Replacement (1-13) - Continued
Camshaft Lobe Pitting Reuse Criteria (1-16)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  227    228    229    230    231  232  233    234    235    236    237  
img
.
TM 5-2420-230-24-2
Section 1 - Cylinder Block - Group 1
Camshaft - Cleaning (1-14)
B Series Shop Manual
Page 1-29
Camshaft - Cleaning (1-14)
Wash the camshaft and gear with solvent and a lint free
cloth.
Camshaft and Gear - Inspection (1-15)
Inspect the lift pump lobe, valve lobes and bearing jour-
nals for cracking, pitting or scoring.
Inspect the gear teeth for pitting; look for cracks at the root
of the teeth.
Measure the fuel transfer pump lobe and valve lobes.
Diameter at Peak of Lobe
mm
in
Intake
47.040
MIN
1.852
47.492
MAX
1.870
Exhaust
46.770
MIN
1.841
47.222
MAX
1.859
Lift Pump
35.500
MIN
1.398
36.260
MAX
1.428
L-232


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.