• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Final Position for Air Transport - Tie Down Locations
Table 1. Tiedown Instructions

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  457    458    459    460    461  462  463    464    465  
img
TM 5-2420-232-10
0055
SECURE MACHINE FOR AIR TRANSPORT AND LOAD PALLETS
00055
1.
With the machine positioned correctly, the effective center of gravity will be at Fuselage Station 483 offset 3 in. to right of
aircraft center line. The axle and dipper dolly weights and locations are shown in Figure 10.
435-A1789
Figure 10. Axle Weights and Center of Gravity Location
055
2.
The machine is secured to the aircraft floor by a total of 20 x 10,000 lb tiedown devices and 4 x 25,000 lb tiedown
devices. The tiedown pattern is shown in Figure 11 and the tiedown instructions are shown in Table 1.
435-A1790
Figure 11. Tiedown Pattern
055
Change 1
0055-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.