TM 5-3805-281-24-2
Removal and Installation
11. Install leak-off connectors (A) with O-rings on injection
nozzles. Tighten securely.
A--Leak-Off Connector
04
0400
32
CED,OUOE024,211
1918MAY985/7
12. Loosen all leak-off line fittings (A), remove pipes (B),
and inspect packings (C) that are worn or cut.
NOTE: Mark each leak-off pipe before disassembly to
assure assembly in correct location.
13. Check all pipes and fittings for wear or damage and
replace as necessary.
14. Reinstall new packings (if needed), and pipes into
T-fittings. Tighten all connections securely.
15. Install nuts (D) and packings onto leak-off connectors.
A--Fitting
Install complete assembly over appropriate leak-off
B--Pipe
line connectors.
C--Packing
D--Nut
16. Tighten all leak-off line connections securely at each
injection nozzle.
17. Connect leak-off line at injection pump and tighten
securely.
Continued on next page
CED,OUOE024,211
1918MAY986/7
11-32