TM 5-3805-294-23-4
0488
INSTALLATION - Continued
7.
Apply pipe thread sealant to threads of valve (Figure 2, Item 1).
8.
Install valve (Figure 2, Item 1) to fitting (Figure 2, Item 2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0488-4