• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IGNITION SWITCH REPLACEMENT.
POWER DISTRIBUTION PANEL (PDP) ASSEMBLY REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  434    435    436    437    438  439  440    441    442    443    444  
img
. . . .
TM 5-2420-230-24-1
b. Installation.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Ensure all wires are reconnected to positions noted prior to removal.
Install cable ties as necessary.
(1)
Install wire (11), washer (10), and nut (9) on
ignition switch (3).
(2)
Install wire (8), washer (7), and nut (6) on ignition
switch (3).
(3)
Position ignition switch (3) into PDP (5).
(4)
Install nut (4) securing ignition switch (3) to
PDP (5).
(5)
Install selector (2) onto ignition switch (3).
(6)
Install screw (1) onto ignition switch (3).
c. Follow-On Maintenance.
(1)
Close PDP door (TM 5-2420-230-10).
(2)
Start engine and functionally test ignition switch
for proper operation (TM 5-2420-230-10).
(3)
Shut OFF engine (TM 5-2420-230-10).
(4)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
Change 1
12-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.