CHARGE EQUALIZER REPLACEMENT.
CHARGE EQUALIZER REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  438    439    440    441    442  443  444    445    446    447    448  
img
. . . . . . . . . . . . .
TM 5-2420-230-24-1
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Tag all wires and note their positions before removal.
Remove cable ties as required.
(1)
Remove four bolts (1) from charge equalizer (2).
(2)
Disconnect wire harness (3) from charge
equalizer (2).
b. Installation.
NOTE
Ensure all hoses, wires, and tubes are reconnected
to positions noted prior to removal.
Install cable ties as required.
(1)
Install charge equalizer (2) with four bolts (1).
(2)
Connect wire harness (3) into charge equalizer (2).
c. Follow-On Maintenance.
(1)
Close PDP door (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
12-21. MAIN HYDRAULIC MASTER SWITCH REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
Tools and Special Tools
ground.
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Parking brake applied.
TM 5-2420-230-10
Engine shut OFF.
Materials/Parts
Ties, cable, Item 68, Appendix C
TM 5-2420-230-10
Electrical master switch OFF.
TM 5-2420-230-10
"Do Not Operate" tag attached
Personnel Required
to ignition switch.
MOS 62B, Construction Equipment Repairer
Drawings Required
References
TM 5-2420-230-24P Figure 186
None
Estimated Time to Complete Task
Refer to MAC in Appendix B
Change 1
12-38


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.