• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PNEUMATIC SOLENOID VALVE REPLACEMENT. - Continued
PNEUMATIC VALVE ISLAND REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  473    474    475    476    477  478  479    480    481    482    483  
img
. . . . . . .
TM 5-2420-230-24-1
12-34.1. PNEUMATIC VALVE ISLAND REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Para 15-4
Air system drained.
TM 5-2420-230-10
Engine access panel removed.
Materials/Parts
None
Drawings Required
TM 5-2420-230-24P Figure 121
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive
electrical circuits, a direct short may result. Damage to equipment and injury or death to personnel
may occur.
Ensure air pressure is drained to 0 psi (0 kPa) before taking off any air components. If pressure is
not released, components could blow off and harm personnel. The IHMEE air system is pressurized
to 119 psi (820 kPa). Do not drain air from a tank with any part of body in air spray path. Skin
embolisms and/or debris in eyes can occur from released pressure. Failure to comply may result in
injury or death to personnel.
NOTE
The four valve islands are removed in the
same manner.
(1)
Remove two screws (1) and unplug valve
island (2) from pneumatic valve
assembly (3).
Change 1
12-73


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.