TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Engine access panel removed.
Hood raised.
Materials/Parts
Drawings Required
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
a. Removal.
Remove all jewelry such as rings, dog tags,
bracelets, etc. If jewelry contacts battery
terminal, a direct short may result in instant
heating of tools, damage to equipment, and
injury or death to personnel.
NOTE
Tag all wires, and note their positions
before removal.
Remove cable ties as necessary.
All five solenoid coils are removed in the
same manner.
(1)
Remove nut (1) and O-ring (2) from spool
cartridge (3). Discard O-ring.
(2)
from spool cartridge (3). Discard O-ring.
(3)
Disconnect solenoid coil (4) from wiring
harness (6).
Change 1