• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TILT-POSITION POTENTIOMETER REPLACEMENT.
FEL ARM LIFT POTENTIOMETER REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  480    481    482    483    484  485  486    487    488    489    490  
img
. . .
TM 5-2420-230-24-1
b. Installation.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Install cable ties as necessary.
(0.1) If remove, install new O-ring (11) on potentiometer plate (9).
(1)
If required, install potentiometer plate (9) on
FEL arm (10) with four bolts (8).
(2)
Install potentiometer (7) with two screws (5)
and washers (6).
(3)
Install dust cover (4) with four bolts (2) and
new lockwashers (3).
(4)
Connect potentiometer switch (1).
c. Follow-On Maintenance.
(1)
Start engine and perform hydraulic
calibration procedure (Para 10-26).
(2)
Shut OFF engine (TM 5-2420-230-10).
(3)
Remove "Do Not Operate" tag from ignition
switch (TM 5-2420-230-10).
END OF TASK
Change 1
12-80


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.