TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
References
Test Equipment
None
None
Equipment Conditions
Tools and Special Tools
TM or Para
Condition Description
Engine access panel removed
Materials/Parts
(FEL valve only).
Air tank (20 L) removed
(backhoe valve only).
Hydraulic pressure released.
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Tag all wires and note their positions before removal.
Remove cable ties as necessary.
All hydraulic solenoids are removed the same way.
(1)
Loosen screw (1) and disconnect electrical connector (2) from solenoid valve (3).
Change 1