TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
Tools and Special Tools
ground.
Parking brake applied.
Engine shut OFF.
Materials/Parts
Electrical master switch OFF.
"Do Not Operate" tag attached
to ignition switch.
Hood raised.
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
References
Estimated Time to Complete Task
None
a. Removal.
Remove all jewelry such as rings, dog tags,
bracelets, etc. If jewelry or tools contact
positive electrical circuits, a direct short may
result. Damage to equipment and injury or
death to personnel may occur.
NOTE
Tag all hoses and wires and note their
positions before removal.
Remove cable ties as necessary.
Ensure all hoses and wires are disconnected
and cleared before removal.
(1)
Remove two wiring harness plugs (1) from
from two washer pumps (2).
(2)
Remove two washer hoses (3) from two washer pumps (2).
(3)
Remove two bolts (4), lockwashers (5), and washer bottle assembly (6) from washer bottle bracket (7). Discard
(4)
If required, remove washer pumps (2) from washer bottle assembly (6).
Change 1