TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Repair
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Belly plate beneath air cleaner
stowage box removed.
Materials/Parts
Air cleaner filter removed.
Hose reel switch removed.
Ether start assembly removed
(if equipped).
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
a. Removal.
(1)
Remove flexible tube (1) and adapter (2)
from rear of air cleaner housing (3).
(2)
Loosen band clamp (4) and remove rubber
elbow (5) from rear of air cleaner
housing (3).
Change 1