TM 5-2420-230-24-1
b. Installation.
(1)
If removed, install three new threaded inserts (5).
(2)
Install six screws (2) and hinge (3) on frame (4).
c. Follow-On Maintenance.
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
References
None
Estimated Time to Complete Task
Change 1