• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ETHER START ASSEMBLY REPLACEMENT. - Continued
ETHER START PUSHBUTTON REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  705    706    707    708    709  710  711    712    713    714    715  
img
. . .
TM 5-2420-230-24-1
(3)
Install cylinder clamp (16) on stowage
box (12) with two screws (15), new
lockwashers (14), and nuts (13).
(4)
Install valve fitting (3) on valve
assembly (11).
(5)
Install valve assembly (11) on stowage
box (12) with two screws (10), washers (9),
new lockwashers (8), and nuts (7).
Remove all jewelry such as rings, dog
tags, bracelets, etc. If jewelry or tools
contact positive electrical circuits, a direct
short may result. Damage to equipment
and injury or death to personnel may
occur.
Ensure starting fluid cylinder is removed
prior to working with valve assembly
wires. Failure to comply may result in
injury or death to personnel and/or
damage to equipment.
(6)
Connect four wires (5) and (4) with two new
wire connectors (6).
(7)
Place tube fitting (1) on tubing (2), and
install tubing on valve fitting (3) with tube
fitting. Tighten tube fitting approximately
one turn after it is finger tight.
c. Follow-On Maintenance.
(1)
Close engine hood and secure clips
(TM 5-2420-230-10).
(2)
Install starting fluid cylinder (Para 20-15).
(3)
Install R/S front belly plate
(TM 5-2420-230-10).
END OF TASK
Change 1
20-46


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.