• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ETHER START ASSEMBLY REPLACEMENT. - Continued
ETHER START PUSHBUTTON REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  706    707    708    709    710  711  712    713    714    715    716  
img
. . . . . . . . . . . . .
TM 5-2420-230-24-1
20-14. ETHER START PUSHBUTTON REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
ground.
Tools and Special Tools
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Parking brake applied.
TM 5-2420-230-10
Engine shut OFF.
TM 5-2420-230-10
Electrical master switch OFF.
Materials/Parts
Tags, identification, Item 63, Appendix C
TM 5-2420-230-10
"Do Not Operate" tag attached
Ties, cable, Item 68, Appendix C
to ignition switch.
TM 5-2420-230-10
PDP door opened.
Personnel Required
MOS 62B, Construction Equipment Repairer
Drawings Required
TM 5-2420-230-24P Figure 207
References
None
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Tag all wires and note their positions before removal.
Remove cable ties as necessary.
(1)
Remove screw (1) and wire (2) from switch (3).
(2)
Remove screw (4) and wire (5) from switch (3).
(3)
Remove nut (6) and switch (3) from side instrument panel (7).
Change 1
20-47


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.