• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVE, INSPECT, AND INSTALL PISTON COOLING ORIFICES
MEASURE CYLINDER LINER STANDOUT (HEIGHT ABOVE BLOCK)

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  159    160    161    162    163  164  165    166    167    168    169  
img
TM 5-3805-280-24-2
Cylinder Block, Liners, Pistons and Rods
MEASURE FUEL SUPPLY PUMP PUSH ROD
10
50
BORE AND PUSH ROD OD
1. Visually inspect and measure fuel supply pump push
rod OD.
2. If rod is worn or not within specification, install a new
rod.
Push Rod--Specification
OD ................................................................................. 9.891--9.917 mm
(0.3894--0.3904 in.)
Push Rod Bore in Block--Specification
ID ................................................................................... 10.00--10.05 mm
(0.3937--0.3957 in.)
RG,10,DT7393 1911NOV971/1
13-163


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.