TM 5-3805-294-23-4
0584
RESERVOIR AND PUMP INSTALLATION - Continued
5.
Connect machine wiring harness connector M6 (Figure 6, Item 1) to pump (Figure 6, Item 2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0584-7/8 blank