TM 5-3805-294-23-4
0597
FOLLOW ON MAINTENANCE
1.
Install deep dig attachment pattern change switch. (Volume 5, WP 0678)
2.
Install hydraulic hose reel selector switch. (Volume 5, WP 0694)
3.
Install storage compartment forward access panel. (WP 0609)
4.
Install hydraulic hose reel. (Volume 5, WP 0693)
5.
Install air cleaner. (Volume 3, WP 0456)
6.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0597-6