TM 5-3805-294-23-4
0649
RIGHT SIDE BOOM LOAD HOLDING VALVE REMOVAL - Continued
15
16
14
17
20
18
26
23
21
10
22
11
12
19
13
6
7
9 8
24
1
2
3
4
25
5
HYEX00710
Figure 1.
Right Side Boom Load Holding Valve Removal.
2.
Remove fitting (Figure 1, Item 2), O-ring (Figure 1, Item 3), and sealing ring (Figure 1, Item 4) from boom load
holding valve (Figure 1, Item 5).
3.
Remove O-ring (Figure 1, Item 3) and sealing ring (Figure 1, Item 4) from fitting (Figure 1, Item 2). Discard O-
ring.
4.
Remove hose (Figure 1, Item 6) from fitting (Figure 1, Item 7).
5.
Remove fitting (Figure 1, Item 7), O-ring (Figure 1, Item 8), and sealing ring (Figure 1, Item 9) from boom load
holding valve (Figure 1, Item 5).
6.
Remove O-ring (Figure 1, Item 8) and sealing ring (Figure 1, Item 9) from fitting (Figure 1, Item 7). Discard O-
ring.
7.
Remove hose (Figure 1, Item 10) from fitting (Figure 1, Item 11).
8.
Remove fitting (Figure 1, Item 11), O-ring (Figure 1, Item 12), and sealing ring (Figure 1, Item 13) from boom
load holding valve (Figure 1, Item 5).
9.
Remove O-ring (Figure 1, Item 12) and sealing ring (Figure 1, Item 13) from fitting (Figure 1, Item 11). Discard
O-ring.
10.
Remove bolt (Figure 1, Item 14), lockwasher (Figure 1, Item 15), holder (Figure 1, Item 16), and holder (Figure
1, Item 17) from line (Figure 1, Item 18) and clamp (Figure 1, Item 19). Discard lockwasher.
11.
Remove hose (Figure 1, Item 20) from line (Figure 1, Item 18).
12.
Remove four screws (Figure 1, Item 21), line (Figure 1, Item 18), O-ring (Figure 1, Item 22), and O-ring (Figure
1, Item 23) from boom load holding valve (Figure 1, Item 5). Discard O-rings.