• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER PACK REPLACEMENT - Continued
POWER PACK REPLACEMENT - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  164    165    166    167    168  169  170    171    172    173    174  
img
TM 5-2420-230-24-1
The engine and transmission assembly weighs approximately 1 ton (907 kg). To avoid the possibility
of personal injury, loss of life, and the destruction of the vehicle, only a qualified person using
certified lifting equipment is to carry out slinging operations involving the IHMEE. Failure to comply
may result in injury or death to personnel.
(56) Install lifting eye on transmission.
(57) Attach adjustable sling with capacity suitable for combined weight of engine and transmission to engine and
transmission lifting eyes.
(58) Use lifting device and adjustable sling, remove weight from engine and transmission mounts.
(59) Remove elbow and hose in front of left transmission mount.
(60) Remove two self-locking nuts (48), washers (49), and bolts (50) from transmission mounts (51). Discard
self-locking nuts.
(61) Remove four bolts, lockwashers, and two
mounts from transmission. Discard
lockwashers.
(62) Remove bolt (52) and washer (53) from
engine mount (54).
Carefully maneuvering without causing
further damage to equipment.
(63) Carefully lift engine and transmission
assembly out of engine bay.
Change 1
4-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.