• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER PACK REPLACEMENT - Continued
POWER PACK REPLACEMENT - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
.
TM 5-2420-230-24-1
Drive shafts are heavy. Ensure no personnel
are under a drive shaft when it is removed.
Failure to comply could result in serious
injury or death to personnel.
(31) Position rear drive shaft (26), align scribe
marks, and install eight bolts (25),
washers (24), and new self-locking nuts (23).
Tighten nuts to 38-48 lbf/ft (52-65 Nm).
(32) Uncage brake chamber (Para 8-8).
(33) Jack vehicle and remove jack stands.
(34) Lower vehicle.
(35) Position front drive shaft, align scribe marks, and install two retaining straps (18) and four bolts (17) securing
drive shaft to yoke (19).
(36) Install eight bolts (22), washers (21), and new self-locking nuts (20). Tighten nuts to 38-48 lbf/ft (52-65 Nm).
Change 1
4-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.