• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER PACK REPLACEMENT - Continued
POWER PACK REPLACEMENT - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  166    167    168    169    170  171  172    173    174    175    176  
img
TM 5-2420-230-24-1
(5)
Install washer (53) and bolt (52) into engine mount (54). Hand-tighten bolt.
(6)
Install two bolts (50), washers (49), and new self-locking nuts (48) into transmission mounts (51). Hand-tighten
bolts.
(7)
Install elbow and hose in front of left transmission mount.
(8)
Lower weight of engine and transmission onto mounts. Torque bolts (50) and (52) to 258 lbf/ft (350 Nm).
(9)
Remove adjustable sling and lifting device.
(10) Remove lifting eye from transmission.
NOTE
If vehicle has cold weather kit, install two clamps and hoses in Step (11).
(11) Install heater pressure hose (46.2) and clamp (46.1) on fitting (47) located on rear of engine block (47.1).
(12) Connect wiring harness (46) at fuel shutoff.
(13) Connect engine oil pressure sensor wire (45).
(14) Install air compressor supply line (42) and two governor lines (43) at air compressor (44).
(15) Connect throttle cable (41) where it meets fuel metering unit.
Change 1
4-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.