TM 5-2420-230-24-1
Upon completion of maintenance activities, restore power and return vehicle to operational readiness by doing the following:
(1)
(2)
(3)
(4)
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position as required
(6)
Complete necessary documents and return IHMEE to relevant authority.
This Task Covers:
b. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
"Do Not Operate" tag attached
Materials/Parts
to ignition switch.
Hood raised.
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Drawings Required
References
None.
Estimated Time to Complete Task
Change 1