TM 5-2420-230-24-1
e. Follow-On Maintenance.
(1)
(2)
(3)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Test Equipment
None
TM or Para
Condition Description
Tools and Special Tools
ground.
Materials/Parts
ignition switch.
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
References
Estimated Time to Complete Task
None
Change 1