12-14. ROCKER SWITCH REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
ground.
Tools and Special Tools
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Parking brake applied.
TM 5-2420-230-10
Engine shut OFF.
TM 5-2420-230-10
Electrical master switch OFF.
Materials/Parts
Ties, cable, Item 68, Appendix C
TM 5-2420-230-10
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
MOS 62B, Construction Equipment Repairer
Drawings Required
TM 5-2420-230-24P
Figure 48
TM 5-2420-230-24P
Figure 71
References
None
TM 5-2420-230-24P
Figure 72
TM 5-2420-230-24P
Figure 73
TM 5-2420-230-24P
Figure 189
Estimated Time to Complete Task
Approximately 0.5 hr.
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Remove cable ties as necessary.
Ensure all wires are disconnected and cleared before removal.
To gain access to switches, some components may need to be removed.
All rocker switches are removed and installed in a similar manner.