• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STARTER MOTOR REPLACEMENT.
MASTER LIGHT SWITCH REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  416    417    418    419    420  421  422    423    424    425    426  
img
. . . . .
TM 5-2420-230-24-1
b. Installation.
Remove all jewelry such as rings, dog tags,
bracelets, etc. If jewelry or tools contact positive
electrical circuits, a direct short may result.
Damage to equipment and injury or death to
personnel may occur.
NOTE
Ensure all wires are reconnected to positions
noted prior to removal.
Install cable ties as necessary.
(1)
Position starter (3) on engine.
(2)
Install three bolts (8) securing starter (3) to
engine. Tighten bolts to 32 lbf/ft (43 Nm).
(3)
Install wire (7) on starter (3) with washer (6) and nut (5).
NOTE
If vehicle has cold weather kit, install four wires on starter.
(4)
Install three wires (4) on starter (3) with washer (2) and nut (1).
(5)
Install hose on transmission oil cooler.
c. Follow-On Maintenance.
(1)
Replace right fender (Para 13-16).
(2)
Fill cooling system (Para 9-4).
(3)
Start engine to check starter for proper operation (TM 5-2420-230-10).
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Lower hood (TM 5-2420-230-10).
END OF TASK
Change 1
12-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.