TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
FO-3, Electrical schematic
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Drive belt removed.
Materials/Parts
Drawings Required
Estimated Time to Complete
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Tag all wires and note their positions before removal.
Remove cable ties as necessary.
Ensure all wires are disconnected and cleared before removal.
(1)
Remove three electrical connections on rear of alternator.
(2)
Remove bolt and nut securing alternator to angle bracket.
(3)
Remove screw and alternator from mounting bracket.
(4)
Remove pulley from alternator, if required.
Change 1