• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROCKER SWITCH REPLACEMENT - Continued
AUXILIARY DEFROSTER SWITCH REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  424    425    426    427    428  429  430    431    432    433    434  
img
. . . . . . . . . . . . .
TM 5-2420-230-24-1
12-16. STARTER SOLENOID REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
ground.
Tools and Special Tools
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Parking brake applied.
TM 5-2420-230-10
Engine shut OFF.
TM 5-2420-230-10
Electrical master switch OFF.
Materials/Parts
Tags, identification, Item 63, Appendix C
TM 5-2420-230-10
"Do Not Operate" tag attached
Ties, cable, Item 68, Appendix C
to ignition switch.
TM 5-2420-230-10
PDP door opened.
Personnel Required
MOS 62B, Construction Equipment Repairer
Drawings Required
TM 5-2420-230-24P Figure 48
References
None
Estimated Time to Complete
Refer to MAC in Appendix B
a. Removal.
Remove all jewelry such as rings, dog tags,
bracelets, etc. If jewelry or tools contact
positive electrical circuits, a direct short may
result. Damage to equipment and injury or
death to personnel may occur.
NOTE
Tag all wires and note their positions before
removal.
Remove cable ties as necessary.
(1)
Remove four nuts (1) and wires (2) from starter
solenoid (3).
(2)
Remove two bolts (4) from starter solenoid (3).
(3)
Remove starter solenoid (3).
Change 1
12-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.