• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Ether Start - Continued
Ether Start - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  675    676    677    678    679  680  681    682    683    684    685  
img
TM 5-2420-230-24-1
(24) Loosen two clamps (146) and remove hose (147) from elbow (148) and tube (149). Discard hose.
(25) Disconnect tube (150) from fitting (151) and loosen screw (152).
(26) Remove T-fitting (153) from rear side of air cross connection (154).
(27) Remove plug (155) from front side of air cross connection (154).
(28) Install T-fitting (153) in front side of air cross connection (154).
(29) Connect tube (150) on fitting (151) and tighten screw (152).
(30) Install 18-in. (457 mm) hose (156) on tube (149) and elbow (148) with two clamps (146).
(31) Remove tube fitting (157) from atomizer (158).
(32) Install atomizer (158) on rear side of air cross connection (154).
(33) Install tube (130) on atomizer (158) with tube fitting (157). Tighten tube fitting approximately one turn after it is
finger tight.
Change 1
20-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.