If turbine and hub was disassembled, use the following instruc-
tions for reassembly.
1. Clean hub mounting surface and tapped holes with solvent.
Dry thoroughly being certain tapped holes are dry and clean.
2. Install backing ring and special self locking screws.
Tighten screws 40 to 45 lbs. ft. (54.3-61.0 N.m.). NOTE:
Assembly of hub must be complete within a fifteen minute
period from start of screw installation. The special screw is to be
used for one installation only. If the screw is removed for any
reason it must be replaced. The epoxy left in the hub holes must
be removed with the proper tap and cleaned with solvent. Dry
hole thoroughly and use a new screw for reinstallation.
Figure 294
Separate turbine from impeller cover.
Figure 297
Figure 295
Position turbine and hub assembly in impeller cover assembly.
Remove impeller cover bearing.
See cleaning and inspection page.
REASSEMBLY
Figure 296
Figure 298
Install impeller cover bearing.
Position bearing washer over turbine hub.
--51--