• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Turbocharger - Installation (0-116) - Continued
Belt Tensioner - Installation (0-120)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  194    195    196    197    198  199  200    201    202    203    204  
img
.
TM 5-2420-230-24-2
Vibration Damper - Installation (0-118)
Section 0 - Engine Disassembly and Assembly - Group 00
Page 0-110
B Series Shop Manual
10 mm
Install the ``package''.
Torque Value: 24 Nm
[18 ft-lb]
Vibration Damper - Installation (0-118)
15 mm
Install the crankshaft pulley/vibration damper.
Torque Value: 125 Nm
[92 ft-lb]
Fan Hub - Installation (0-119)
10 mm
Install the fan hub.
Torque Value: 24 Nm
[18 ft-lb]
10 mm or 13 mm
Install the fan hub pulley.
Torque Value
8 mm Capscrew - 24 Nm [18 ft-lb]
10 mm Capscrew - 43 Nm [32 ft-lb]
L-199


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.