• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Slave Receptacle Installation
STARTER POSITIVE CABLE REPLACEMENT

Maintenance Manual For Hydraulic Excavator Type 1 With Hydraulic Thumb And Quick Latch -4 Page Navigation
  308    309    310    311    312  313  314    315    316    317    318  
img
.
TM 5-3805-294-23-4
0526
INSTALLATION - Continued
8.
Install bracket (Figure 2, Item 3) to machine (Figure 2, Item 4) with two washers (Figure 2, Item 2) and bolts
(Figure 2, Item 1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect negative battery cable. (WP 0521)
2.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0526-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.